fragmente abfall vermeiden 4MO1PTFN | © Eventfrog
CH · St. Gallen

Fragmente – Abfall vermeiden

Mon, 07.12. · Starting 18:30 o'clock
Eventfrog

Description

The waste incineration plant in Weinfelden, which was built in 1996, no longer meets the latest requirements and is to be replaced. Despite efforts to reduce the amount of waste, capacity is to be increased by 50%.

Instead of expanding the current plant, which consists of two furnace lines, by a third line, the Thurgau waste incineration plant association decides to plan a new building. A study contract is carried out and a new project is chosen, which is several times larger than the current plant, although the capacity would only be increased by 50%.

The question arises as to why the existing plant should not be expanded, since this could be achieved by adding a third kiln line, which would be possible without interrupting operations and would be much more cost-effective than the planned new building. In May of this year, the Thurgau waste incineration plant association reported: "The replacement construction project will be interrupted and reviewed."

Detailed description

The waste incineration plant in Weinfelden, which was built in 1996, no longer meets the latest requirements and is to be replaced. Despite efforts to reduce the amount of waste, capacity is to be increased by 50%.

Instead of expanding the current plant, which consists of two furnace lines, by a third line, the Thurgau waste incineration plant association decides to plan a new building. A study contract is carried out and a new project is chosen, which is several times larger than the current plant, although the capacity would only be increased by 50%.

The question arises as to why the existing plant should not be expanded, since this could be achieved by adding a third kiln line, which would be possible without interrupting operations and would be much more cost-effective than the planned new building. In May of this year, the Thurgau waste incineration plant association reported: "The replacement construction project will be interrupted and reviewed."

Description
Lecture by Kurt Huber, followed by a panel discussion with Erol Doguoglu and Elischa Bischof, moderated by Karin Salm.

Dates

1 Day · 1 Month
  • Starting 18:30 o'clock Next Date

Details

Season
  • Winter

Location

Location
Architektur Forum Ostschweiz Davidstrasse 40
9000 St. Gallen, Switzerland

Organizer

Architektur Forum Ostschweiz